
Subject:
Powerhead Overheating
Models:
All 20-35 Recreational Models, CS and Later
Problem:
Water inlet screen blocked by debris.
Solution:
Drill four additional water inlet holes. This is recommended for commercial and high usage applications.
1
Mark hole locations in center of anti-ventilation plate lower radius, directly above inlet screen screws. Mark hole locations on both sides of gearcase, using a square template, as shown.
2
Center punch, then drill ⁵⁄₃₂ in. (4.0 mm) holes through radius (at 45° angle) into water passage, as shown.

