LOWER UNIT #1023
September, 1973
TEST PROGRAM FOR ALL 1973 50 THRU 135 HP MODELS
MANUFACTURED PRIOR TO JANUARY 1, 1973

Recently, all selling dealers of the above subject models were notified
by Service Letter No. 109 advising of the test program. The purpose of
this bulletin is to notify the non-selling Evinrude dealers of the program
and also to serve as a reminder to the selling dealers.
We wish to solicit the cooperation of all our servicing dealers who have
the capability to disassemble and repair the above subject model gearcases
should one of these units fail the test.
Those dealers who are requested and have the capability to make the above
tests may contact the Evinrude Service Department so that we can forward
to you the tools required to make the test on the 50 HP and V-4 models.
EVINRUDE MOTORS
Service Department
Enclosures: Service Letter 109
Owner Letter
Instruction Sheets
OUTBOARD GEARCASE SAFETY SHIFTING TEST INSTRUCTIONS
FOR 1973 50 - 135 H.P. OUTBOARDS
NOTE: If there are any questions concerning this test either about procedures,
repairs, parts, claims or other difficulties contact:
Evinrude Motors
Attention: Service Department
4143 N. 27th Street
Milwaukee, Wisconsin 53201
1. Fill out shifting test special claim form: Servicing Dealer Information.
2. Use only OMC 13 x 19 aluminum propeller, part number 382765. No other
propeller may be used.
3. Tie boat securely at both ends to a secure dock, or mount motor securely
in test tank and hook up electric and shift cables. Be sure tilt lever is in
a "lock" or "run" position.
4. Start engine and warm up a minimum of three minutes in neutral and stop
engine.
5. Remove motor cover. Remove cable retainer, lower motor cover cable
clamp (50 H. P.) or rubber grommet (65 & V-4's). Remove spring clip and
completely remove throttle cable from engine.
6. On 50 H.P. engines thread large hex cap on idle speed adjustment screw
until tight. See Figure 1.
On 65 H.P. engines no cap is required on idle speed adjustment screw.
See Figure 2.
On 85, 115 and 135 H.P. engines install the small cap on the idle speed
screw over the regular black plastic cap and return spark advance lever
to idle to hold cap in place. See Figure 3.
7. Start engine, shift motor to forward gear and adjust engine idle screw to the
following RPMs: 50 H.P. - 1400 - 1450 RPM
65 H.P. - 1275 - 1325 RPM
85/115 H.P. - 1075 - 1125 RPM
135 H.P. - 1000 - 1050 RPM
NOTE: Check engine RPM with boat tachometer or shop tach and recheck
to see that RPM has stabilized within RPM range above. Replace
motor cover.
8. Shift motor through 25 complete cycles (F-N-R-N-F-etc.) without hesitating
in neutral or either gear position. The 25 shifting cycles must be completed
as rapidly as possible, 20 seconds maximum total time.
9. At completion of 25 shifting cycles, leave shift lever in forward gear and
check to see that gearcase is actually in forward gear.
(over)
10. Stop engine in forward gear. Record shift test results on special claim
form: Tested and No Failures, or, Unit Failed During Test.
11. Remove motor cover. Remove idle screw test cap and adjust idle speed
as follows: 50 H.P.: 700 RPM maximum in reverse gear.
65 H.P.: 1000-1100 RPM in neutral.
85/115/135 H.P.: 650 RPM maximum in gear.
Reinstall throttle cable. Remove 13 x 19 testing propeller and install
customer's propeller if it was removed.
IF MOTOR PASSED SHIFTING TEST:
12. If motor passed shifting test without malfunction, start the motor and check
for correct operation of shift, throttle, etc., and adjust as required.
Refer to Service Bulletin Fuel System #1019. Winterize motor if it was
winterized before test. Clean motor and control and replace motor cover.
13. Put three identifying marks on the top trailing edge of the gearcase with
a center punch as shown in Figure 4.
14. Return motor to customer and have him sign shifting test special claim
form.
IF MOTOR DID NOT PASS SHIFTING TEST:
15. If the motor malfunctioned during this test and failed to continue shifting
or did not return to forward gear at the completion of the test, repair the
gearcase according to approved Evinrude procedures as detailed in the
appropriate outboard motor service manual, Section VI.
16. Fill in shifting test special claim form: Parts Used and Flat Rate Time.
17. After gearcase repairs have been completed, repeat complete test Items
1 through 14 above.
List of parts required to repair gearcase if malfunction occurs:
386592 - Shift Rod and Bearing Assembly (50 & 65 H.P. engines)
386593 - Shift Rod and Bearing Assembly (85, 115 & 135 H.P. engines)
313446 - O-Ring-Prop. Shaft Bearing Housing (All engines)
316564 (Four Required) - Screw-Prop. Shaft Bearing Housing (50 & 65 H.P.)
316563 (Four Required) - Screw-Prop. Shaft Bearing Housing (85, 115, & 135 H.P.)
314502 - Cotter Pin - Propeller Nut (All engines)
314082 - Gasket - Solenoid Cover (50 & 65 H.P. engines)
314876 - Gasket - Solenoid Cover (85, 115 & 135 H.P. engines)